From first sketch to move-in
Modular construction moves the build off the site and into a factory. Once the modules arrive, the timeline on the plot compresses to days.
- Foundation
- Screw piles, no concrete
- Placement
- By crane, module by module
- On the plot
- Days, not months
- Later
- Demountable, relocatable
No wet concrete, no weather to wait out.
Modular construction moves the build off the site and into a factory. Modules are fabricated and fitted out, electrics and plumbing included, under cover, then trucked to the plot and connected. There's no wet concrete to cure and no weather to wait out, so the timeline compresses to days once modules arrive.
Modules can be placed side by side or stacked, which is what lets the same method scale from a single garden studio to a full administrative building. And because nothing is permanently fixed to the ground, a finished build can later be taken apart and relocated rather than demolished.
Screw piles, crane, connection
What a placement day looks like, photographed at the Dudelange site: the piles are already in when the trailer arrives, and each module is lifted straight onto them.
The module is placed on foundation screws prepared beforehand. No excavation, no poured concrete, no sealed soil.
After the first module, the second soon follows, lowered by crane into position beside it.
Once again the modules are attached seamlessly to each other, mechanical fixings rather than anything permanent.
The ensemble finds itself together once again. Exterior finishes follow soon after.
The build quality of a workshop, on a site's timeline
See two real deliveries, from the workshop to the site- Schedule
No drying time
Dry, off-site assembly has no drying time to wait for.
- Performance
Passive-house performance
Solid CLT insulates naturally, so finished builds run close to passive-house efficiency without extra add-ons.
- Safety
Safer to build
Fabricating under cover means better working conditions and fewer risks for the teams.
- Neighbours
Cleaner, quieter sites
Less on-site work means less disruption to neighbours and a tidier plot throughout the build.
How it comes together
Design
We shape the layout and finish around your site and budget.
About us →Fabricate
Modules are built and fitted out under cover in our workshop, electrics and plumbing included.
Module assembly →Transport
Finished modules travel by truck to your plot, ready to place.
Transport →Assemble
Crews connect and finish the build on site, on screw-pile foundations, often within days.
Above ↑Ready to see what fits your site?
Tell us your space and timeline; we'll come back with a configuration and a quote. The earlier you talk to us, the more the module method can save you.
8c rue Collart
L-8414 Steinfort
+352 621 242 483 Deutschlandc/o Roy Müller
Levetzowstr. 20
10555 Berlin
+49 30 670 313 20 Belgique+32 496 50 74 21