Halzebatz/How we build/Module assembly

From machined CLT panels to a wrapped, weathertight box

A Halzebatz module is built as a box rather than as a building. By the time it leaves ELH, there is nothing structural left to do on the plot.

Where
ELH, Marnach
Phase one
Inside the hall
Phase two
Out in the yard
Steps shown
9
Project
natur&ëmwelt, Dudelange
01 · How it is built

A box, not a building

A Halzebatz module is built as a box rather than as a building. The floor is set out flat first, the CLT walls and roof close it, and the module is only finished once it is insulated, lined, sealed and wrapped. By the time it leaves, there is nothing structural left to do on the plot.

All of it happens at ELH, in two places on the same grounds. Inside the hall the panels are machined and the floor cassette is built up on the bench. Out in the yard the box goes up, gets its services and lining, and is wrapped for the weather. The photographs below are from the first modules for the natur&ëmwelt centre de soins in Dudelange.

02 · The material

Boards glued crosswise, machined before they arrive

Cross-laminated timber is layers of solid board bonded at right angles to each other. That is what lets a panel this thin carry a roof, stay flat, and be drilled and cut to the millimetre.

Close-up of the cut edge of a CLT panel, showing the boards bonded in alternating directions
The cut edge gives the method away: each layer runs across the one below it.
A CLT panel with two rectangular openings already milled out of it
Openings are milled at the mill. The panel reaches the bench with its holes in the right places.
03 · Phase one

Inside the hall

Panels in, floor cassette out. This is the part of the module that everything else is measured from.

  1. Panels arrive wrapped and banded, cut to this module. Nothing on the stack is a standard size waiting to be trimmed.

  2. Each panel carries its own label and corner protection, and waits in the order the build needs it.

  3. A perimeter beam with pre-cut pockets fixes where every member sits, and the deck goes over the top.

  4. Waste and supply runs are laid into the build-up while it is still open. Once the deck closes, they are inside the floor.

  5. Insulation and boards are built up across the element. Where the load lands on the edge, a solid timber block or a painted steel beam is let in, depending on the module, flush with the insulation around it.

A delivery of timber arriving under white wrapping, with CLT panels stacked alongside Stacks of CLT panels inside the workshop, edge-protected and labelled The floor element of the module, showing a perimeter beam with pre-cut pockets and the deck over it A large waste pipe laid into the floor build-up before the deck is closed
Corner of the insulated deck, with a glulam block let into the edge and fixings recessed into the boardsTimber blockA painted steel beam let into the edge of the floor cassette on the workshop benchSteel beam
01 / 05
04 · Phase two

Out in the yard

The cassette moves a few metres outside onto timber cribbing, the box goes up around it, and the module is closed for good.

  1. The finished cassette comes out of the hall onto timber blocking at working height, edges insulated and the membrane turned up ready to close.

  2. Anything that passes through the envelope gets its own sealed collar, fitted and checked here rather than on the plot.

  3. Walls are lined and finished, the CLT ceiling stays exposed, and outlets and service holes are already cut where they belong.

  4. Each finished shell is wrapped and left on its blocking, weathertight, waiting for a delivery date rather than for a dry week. The modules shown here are the ones for the wildlife care centre in Dudelange; their flat green roof goes on once they are placed.

The floor cassette outdoors on timber cribbing, with rigid insulation along the edge and the membrane being folded up over it A sealed circular collar fitted around a pipe passing through the timber deck Inside a finished module: white lined walls, exposed CLT ceiling, timber floor, and sockets and service holes already cut Three finished module shells wrapped in blue membrane, standing on timber blocking in the yard 06 / 09
05 · Why it happens here

Off-site fabrication is easier and more efficient to manage

  • Energy

    Less transport, less energy wasted

    Materials are delivered once, to one workshop, and the work happens under one roof. Fewer journeys and fewer outside factors mean less energy goes to waste.

  • Mill

    Cut once, at the mill

    Panels arrive machined to the module, openings included, so the hall is for assembly rather than for fitting things to size.

  • Weather

    No weather in the schedule

    Under cover and then under wrap, a wet week costs nothing. Groundwork on the plot runs in parallel with the module being built.

  • Inspection

    Sealed before it ships

    Insulation, membranes, collars and services are finished where they can be inspected, not on a site with a crane waiting.

Every module is built from the same 295 × 900 × 370 cm shell as standard, and up to 350 × 1350 × 375 cm where the brief asks for it. What gets fitted inside it is on Components; how it travels is on Transport; what happens once it reaches the plot is on On-site assembly.

Ready to see what fits your site?

Tell us your space and timeline; we'll come back with a configuration and a quote. The earlier you talk to us, the more the module method can save you.

Luxembourgc/o Pit Streicher
8c rue Collart
L-8414 Steinfort
+352 621 242 483
Deutschlandc/o Roy Müller
Levetzowstr. 20
10555 Berlin
+49 30 670 313 20
Belgique+32 496 50 74 21
×
×

Cart