From the factory to the site, module by module
Every module leaves the factory finished, cladding, glazing and interior largely done, and travels the rest of the way by road. Every module is sized to stay in transport category 1, and that decides its width. Two real deliveries, photographed leg by leg.
- Max length
- 13.50 m
- Max height
- 3.75 m
- Max width
- 3.50 m
- Transport category
- 1
Sized for the road: category 1, by design
Oversize road transport is graded into categories, and every step up brings more conditions: permits, escorts, prescribed routes, restricted hours. Halzebatz modules are dimensioned so that they never leave the first one.
The width is the number that matters. Up to 3.50 m a loaded module stays in transport category 1, the lightest regime for an exceptional load. That is why the standard module measures 2.95 m and even the largest configuration never goes past 3.50 m.
At 9.00 m, the standard module stays well under the 13.50 m maximum length. A wider box would gain floor area and lose it again on the road, in permits, escort vehicles and waiting days. Staying in category 1 means a module can leave the workshop on a Monday and stand on its piles the same week, on a route a normal low-loader can drive.
These deliveries date from an earlier partnership. The factory these modules shipped from is not the one Halzebatz fabricates with today.
Every module leaves the factory finished, cladding, glazing and interior largely done, and travels the rest of the way by road. The photos below follow one real pair of modules on their full journey: shipped from the factory to a first site in Kautenbach, then later disassembled and relocated to their permanent site in Dudelange, lifted into place by crane on each leg.
Belgium into Luxembourg, twice
Real borders, real distances and drive times, checked against current road routing. Waypoints respond to hover.

- Leg one
- ≈ 90 km1h16
- Leg two
- ≈ 83 km1h14
Carlsbourg to Kautenbach
Seven steps, in order. Follow the arrows.







Kautenbach to Dudelange
The same pair of modules, six frames later, on their permanent site.


What happens once the crane leaves is on On-site assembly. How the modules were built in the first place is on Module assembly.
Ready to see what fits your site?
Tell us your space and timeline; we'll come back with a configuration and a quote. The earlier you talk to us, the more the module method can save you.
8c rue Collart
L-8414 Steinfort
+352 621 242 483 Deutschlandc/o Roy Müller
Levetzowstr. 20
10555 Berlin
+49 30 670 313 20 Belgique+32 496 50 74 21